progress report: roof is on!

the roof is on! wednesday we successfully placed the last roof panels and we can officially say that we have a roof over our heads.  björn and i couldn't be happier, we were blessed with incredible weather this past week, it has been sunny, blue skies with temperatures in the upper 40's.  it has made working on the roof just fantastic.

one of the final panels

we are looking forward to a few days off, björn is off to his "real" job which these days is like a vacation to him compared to the hard labor of construction, and i am looking forward to meeting with a few people in town to start getting all of our finishes nailed down.  but for now here are a few pictures of the last few roof panels going up and the finished product!


working on the south side of the great room roof

björn driving his favorite machine- the skytrak

placing the last panel

its in place!  now just need to be secured!

the finished roof 




Wednesday, January 4, 2012

progress report: our roof is almost finished

 when we left for our little christmas break we had most of the wall panels in place as well as many of the huge douglas fir beams.  our roof panels were sitting around on the site just waiting to go up.  while i was back on the east coast björn worked on a few of the finishing details that needed to be completed before we could begin to "fly" the roof panels.

beam pockets on the second floor
the douglas fir beam on the second floor

our newest crew member matt was instrumental in accomplishing many of these goals.  he built us a set us stairs so now getting up to the second floor is a breeze, he also finished all of the window openings and assisted björn in prepping all of the roof panels.

our stairwell

björn and the guys also built the loft while I was gone

under the loft is where the dining area will be
we began placing the roof on friday.  mark yerbic from big sky came down to assist us with the first few panels to make sure we were understanding everything.  the first panels to go on were the kitchen.  these consist of three panels for each side of the roof, which we assembled on the ground to make one large piece. the panel was then attached to the skytrak using a lifting plate.  this is basically a large plate that is screwed into the panel with a large strap attached.  björn then lifted the panel and moved it into place.  the guys are positioned to guide the panel and make sure it sits down in the proper location.

Attaching the roof panel to the skytrak boom

lifting plates and the skytrak do the heavy work
the roof panels are bearing on the outside wall and the center beams and are held down using very long screws.  its actually a pretty simple system and because we have a 45 degree pitch on the two sections of the house the whole thing fits together in a really clean and simple way.

moving the first roof panel into place

björn eases the panel down

the view from inside the kitchen as the panel comes down


the panel is in place
the vertical wood blocks keep the panel from sliding off the
side wall while it is screwed in place

making sure the panel is flush wit the exterior wall before screwing it into place
lucky for me björn waited to place the giant beam until I returned.  this monster spans the whole 30 foot great room and is a massive 9" wide by 18" high and weighs a ton (well not really but its heavy).  the skytrak had no problem picking it up and moving it into place.





matt guiding the beam into the pocket above the loft
the other side of the beam- a perfect fit 
working on the main house roof


there are more than 20 panels that make up the roof and you can see most of the process of putting them up here.  check back tomorrow for an update of the completed roof!